![]() ![]() Lugs and lifting parts shall be visually checked for defects such as crack, deflection, improper welding and poor materials prior to start the work.Ĥ. See attached ( INSTALLATION, DESIGN AND MAINTENANCE OF OVERHEAD CRANE)ģ. Cranes shall be assembled and installed in accordance with approved installationĭrawing and manufacturer’s instruction. ![]() Installed before the roof of shelter is covered.Ģ. After executing the installation of rail support structure, crane rails shall be A minimum of three wooden bearers to be used per rail length.ħ.5 Installation and Assembly 7.5.1 Precaution before installationġ. ![]() Good communication between fork truck driver and slinger/signaler must be maintained at all times.ħ.4.3 Rails to be lifted from lorry and lowered onto wooden bearers at floor level in designated storage area. Lifting chains to be double wrapped around rail bundle. 7.4 Offloading of Railħ.4.1 Rail will be off loaded by Mobile Craneħ.4.2 Rails to be lifted in banded bundles. Ensure relevant documentation and certifications are submitted for operators, drivers, scaffolding and rigging.Ĭheck the work areas and monitor from time to time in the implementation of safety procedure and assuring that all safety equipment and tools are present at site and in good working condition.ĥ.10 Permit Receiver and other involved Manpower 6.0 REQUIRED TOOLSĦ.2 Slings/Non Metallic Ropes/Soft Tag LinesĦ.5 Welding Machine for Tacking of Liners/WedgesĦ.6 Wrenches/Leveling Tools/Feelers and Dial GaugesĦ.7 Precision Levels/Calibrated Gauge/Torque Wrench/Hand ToolsĦ.9 Equipment shall be maintained and checked prior to use for safe work assuranceĦ.10 Equipment shall be approved and certified by SAUDI ARAMCOĦ.11 All tools must be calibrated before using 7.0 METHOD STATEMENT FOR INSTALLATION OF OVERHEAD CRANEħ.1 Prepare necessary work permit prior to conduct the activity.ħ.2 Prepare all tools and equipment needed during installation.ħ.3 Provide scaffolding access prior to installation and alignment of crane runway rail & girder. Ensure that all safety requirements have been adequately addressed and the work is carried out in accordance with ARAMCO project safety procedures.ī. Pre-mobilization Inspection and color coding for all tools and equipment used on site. Prepares record and final acceptance documentation where required. Monitor daily activities and verify compliance toĪRAMCO Specifications. Quality Control InspectorĬonduct inspection in accordance with this procedure. Specifications Confirm availability of all materials, tools, equipment and required personnel who willĬarry out the work. 4.0 RESPONSIBILITY Site ManagerĮnsure full compliance by all Millwrights, Mechanical Foreman, Electrician and Labor regardingĮxecution of work and implementation of HSE procedure in accordance with project requirement and 3.4 Inspection and Test Plan/ Method Statement.ģ.4.1 SATIP-M-001-01 Structural Steel- Pipe rack, Steel Supports & Miscellaneous Steel Structures. 3.0 REFERENCES 3.1 Specification and Standardsģ.1.2 S-000-1650-001 Safety Execution Planģ.13 S000-1351-002 Installation Marking Procedureģ.1.4 S-000-3150-001 Installation of Static Equipmentģ.1.5 FWBS CODE (5000) Equipment Installationģ17 S000-1630-003 Material & Equipment Protection Program at work site 3.2 ARAMCO Specification and Standardsģ.2.1 SAES-B-014 Safety Requirement for Plant and Operations Support Buildings.ģ.2.2 SAES-M-001 Structural Design for Non-Building Structure.ģ.2.3 12-SAMSS-008 Erection of Structural and Miscellaneous Steel.ģ.2.7 SCHEDULE Q Saudi ARAMCO Project Quality Requirements.ģ.2.8 Saudi ARAMCO Safety Requirements for Scaffolds.ģ.2.9 Saudi ARAMCO Construction Safety Manual.ģ.2.10 Related Vendors Installation and Maintenance Manuals and Specifications.ģ.2.11 SAES-P-100 Basic Power System Design Criteria.ģ.2.12 SAES-B-053 Machine Safety Guarding, Elevator, Escalator & Conveyors.ģ.2.13 SAES-P-104 Wiring Methods & Materials.ģ.2.14 SATIP-P-113-04 Crane< Hoist and Elevators.ġ.3.1 Steel Design Guide for Baseplate and Anchor Rod Design.ġ.3.3 PIP STS05130 Erection of Stnuctural and Miscellaneous Steel Specification. in accordance with applicable codes, standards for plants and refineries. 2.0 SCOPEĢ.1 This method statement will cover the installation works of Overhead Cranes for Compressor Shelter area, etc. This specification gives a set of recommendations allowing the realization of mounting and fastening of a crane track on girders. This procedure will provide necessary requirements and responsibilities relating to the installation, inspection and test of Overhead Cranes for Compressor Shelters. ![]() The purpose of this Method Statement will serve as a minimum guidelines to carry out the Installation of Overhead Crane. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |